Wozair has recently supplied a number of Single Stage Spray Eliminators (SE1) to JS Power for a prestigious offshore client they are working with.
The SE1 modules, all manufactured in Stainless Steel, have been supplied in varying sizes. The Single Stage Spray Eliminators will be mounted on JS Power’s 80kVA, 135kVA and 350kVA generators, and help provide the necessary power back-up required.
Jonathan Searby, Managing Director of JS Power, explains: “Our initial contact was to seek some advice and assistance on a specific requirement for one of our clients. Tom Shiers was outstanding in his knowledge and understanding of our project and guided us through from concept to design. The Eliminators were manufactured to the highest standard and delivered to meet our timescales. On behalf of JS Power I would like to thank the whole team at Wozair, and we look forward to working with you on a long term basis.”
October 2020
Back to news