Wozair has constructed a new temporary building situated in the lower section of the rear yard in Gillingham, following demand for more space after securing a large project. After a competitive tendering process, Warwickshire based Smart Space were appointed to build the temporary facility at the head offices, which now provides additional space for testing large Air Handling Units (AHU’s).
AHU’s are designed to provide conditioned air that is filtered, cooled, heated, humidified or dehumidified according to customer requirements. Each unit must go through rigorous testing before it is packed and shipped to the client.
Previously, the workshop had capacity for testing only one unit at a time. With the addition of the temporary building multiple units can now be tested simultaneously, resulting in shorter lead times. Wozair are thrilled to have had the option to extend their factory space to meet growing demand.
Smart Space designed the 30m x 15m structure which stands 6m tall with a sloped roof providing extra height. The independently owned and British based company employs over 30 staff working closely with their customers to ensure all regulatory standards are met.
Wozair initially planned to retain the unit for 3 months to assist with current projects; however, if demand for more space continues this may be extended.
August 2018
Back to news